On Saturday, Terminal 2 of Mumbai Airport recieved a threat call following which the officies of various airlines at the departures (level 4), pre security hold area and arrivals (level 2) are were evacuated.
The threat call was received around 11 am at the airport and was later classified as “non-specific”.
However no operations were affected since the runway was closed till 5 pm. Repair works are being carried out on the runway on Tuesday, Thursday and Saturday. The repair work will continue till March 30.